A perfect article needs an eye-catching image. We provide you with images of our projects and construction sites worldwide. You can also discover our videos. Immerse yourself in our company and our construction sites around the world and take a look at our innovative machines. We bring the world of specialist foundation engineering to you.
Noch mehr Videos gefällig?
Terms of use for images of the BAUER Group
All rights of use to the images are held by the BAUER Group. Images may only be used for the purpose of our own editorial reporting. Any other use and disclosure to third parties is prohibited. Whenever a picture is used, "BAUER Group" must be cited as the source.
Organs
Executive Board
Executive Board
Chairman of the Supervisory Board
Geotechnical Solutions
On the east coast of Vancouver Island, the John Hart Dam is being seismically upgraded. BAUER Foundations Canada Inc. has been contracted to construct a new seepage cut-off wall in the main embankment area of the dam.
Since October 2023, Bauer Spezialtiefbau has been improving the soil at the Hessigheim lock over an area of approx. 1,900 m2. The compaction injections are carried out with a specially configured KLEMM KR 806-2DB.
In the town of Krško in the east of Slovenia, a final storage site for low-level and medium-level radioactive waste is being constructed. For this, Bauer Spezialtiefbau built a circular diaphragm wall shaft with a diameter of 32 m and a depth of 65 m.
In Teesside in the north of England, BAUER Technologies Ltd. and a JV partner constructed the foundation for the world's largest monopile factory for offshore wind turbines: approx. 1,500 bored piles with a diameter of up to 1,180 mm and 5,500 CFA piles with diameters of up to 900 mm.
Equipment
The innovative BAUER BCS 185 power pack combines maximum flexibility with a pioneering drive concept: users can choose between a diesel or an electric generator for operation. It is used for diaphragm wall works on the “Grand Paris Express” project.
The “Sabah Al Ahmad Sea City” project in the Kuwaiti desert aims to create living space for 250,000 people, with infrastructure and luxury real estate. This requires soil compaction, where BAUER MC duty-cycle cranes demonstrate their performance under extreme conditions.
A construction site with almost no noise or exhaust fumes? The eRG 19 T hybrid from RTG Rammtechnik GmbH impressively demonstrated that this is possible during a project in Berlin. Its innovative drive combines the power of a diesel engine with the precision of an electric motor.
With groundbreaking machines and innovative solutions for special foundation engineering, the BAUER Maschinen Group once again set new standards at bauma 2025. Several thousand trade visitors flocked to BAUER City.
Resources
How can PFAS be removed from the soil? BAUER Resources GmbH has the answer and presented a real world first at the beginning of 2025 with its mobile soil washing plant. It is particularly groundbreaking for medium-sized projects involving 10,000 to 30,000 tons of PFAS-contaminated soil.
The International Garden Exhibition (IGA) will take place in the Ruhr area in 2027. To this end, the Deusenberg local recreation area in Dortmund, the industrial monument of the former Hansa coking plant and the Mooskamp local transport museum will be upgraded and connected by extensive measures. SPESA Spezialbau und Sanierung GmbH carried out the foundation and subsoil improvement measures for the construction of the new “Haldensprung” pedestrian and cycle bridge.
In Frankfurt am Main, Bauer Resources has built a large-scale geothermal plant: in eight months, three drilling teams have completed more than 19,200 meters of drilling in seven geothermal fields and installed a total of 160 geothermal probes at depths of up to 120 meters.
In the middle of a desert landscape, BAUER Nimr LLC has been operating the world's largest commercial reed bed treatment plant for the treatment of oil-polluted water in Oman for more than ten years. It is significant not only because of its gigantic area of 13.5 km2, but also because of its particularly sustainable mode of operation.
In the small town of Velten, near Berlin, BAUER Resources GmbH replaced soil in order to clean up a former industrial site. A method was used that was inspired by nature: 2,000 m3 of soil were replaced using the honeycomb method.
Plants
The head office of the BAUER Group is located in the Bavarian town of Schrobenhausen.
Many events are held on the grounds of the headquarters, including the BAUER Maschinen Group's in-house exhibition, which attracts numerous national and international guests.
The factory premises in Schrobenhausen are located close to the head office.
Schachtbau Nordhausen has been part of the BAUER Group since 1992. The company is active nationally and internationally in mining, plant engineering, mechanical engineering and steel construction.
As a pioneer in the market, KLEMM has played a decisive role in the development of anchor drilling technology over the past five decades. This has resulted in a technological lead from which customers worldwide benefit.
You might also be interested in…
Our current press releases inform you about the news in the BAUER Group. Take a look now and don't miss anything!
At Bauer, it's the people who drive innovation. Teams pull together and achieve the impossible. Our motto: Passion for Progress.
Bauer's digitalization strategy combines a wide variety of areas through targeted networking.
We view sustainability as a question of responsibility for people and the environment. That’s why we are committed to sustainability in all divisions of our company.