Images & Videos
A perfect article needs an eye-catching image. We provide you with images of our projects and construction sites worldwide. You can also discover our videos. Immerse yourself in our company and our construction sites around the world and take a look at our innovative machines. We bring the world of specialist foundation engineering to you.
Noch mehr Videos gefällig?
Terms of use for images of the BAUER Group
All rights of use to the images are held by the BAUER Group. Images may only be used for the purpose of our own editorial reporting. Any other use and disclosure to third parties is prohibited. Whenever a picture is used, "BAUER Group" must be cited as the source.
Organs
Executive Board
Executive Board
Chairman of the Supervisory Board
Geotechnical Solutions
Situated in the middle of the North Sea and around 50 km from the mainland. To ensure that Germany's only island Helgoland remains accessible in the future, Bauer was commissioned with safeguarding measures on the southern breakwater of the harbor – and this over a length of 70 m.
Sustainable tourism at the Red Sea: A new recreation area that will combine nature, culture and adventure. Bauer constructed piles for several bridge structures as part of this major project – including the construction of 87 offshore piles.
In the immediate vicinity of the Frankfurt Trade Fair, our experts constructed foundation piles as well as a two-phase diaphragm wall. These form the basis for the construction of a 123 m high skyscraper with a four-story underground parking garage.
Deep, deeper, deepest: In the heart of Vienna, Bauer constructed around 35,000 m of bored piles for the expansion of the U2xU5 line crossing. But not just any bored piles, at 61 m they were the deepest in the city of Vienna.
112,000 m² of cut-off wall were constructed directly at the Dead Sea over a length of 4.2 km and down to a depth of 30 m to upgrade large earth basins for potash extraction. The challenge here: the soil, which consists largely of salt.
Equipment
Our newly developed BG 23 H compact version successfully completed its first practical application on an urban construction site in the Charlottenburg district of Berlin.
For the construction of a new water reservoir in the desert of Ra’s al-Chaima, one of the seven United Arabian Emirates, an MC 96 duty-cycle crane equipped with innovative assistant systems was being used.
Whether above or below ground, the electrically driven cutter system in container dimensions opens up completely new application possibilities in the construction of diaphragm walls.
With a drive power of more than 400 kW, the first electrified drilling rig from Bauer falls in the mid-range segment of the drill rig series. It thus covers a very wide range of possible applications on the construction site.
Resources
Since 2014, the innovative EcoVert® technology has been used by the Bauer Umwelt division on the site of the old refinery in Leuna to clean around 500 m3 of contaminated groundwater every day – and in a purely biological way. The result: extreme electricity savings and a significant reduction in CO2 emissions.
Where Magdeburg's valve history was once written, Bauer Umwelt prepared the ground for a successful new start. Around 5,600 m3 of soil was excavated and roughly 3,350 m3 of contaminated material was replaced to a depth of 9 m.
For the energy-efficient rehabilitation of an office building, Bauer Resources constructed a geothermal heat supply system in the southern Hessian town of Eschborn. For this purpose, a total of 44 geothermal probes were installed to a depth of 110 m using the flush drilling method.
In the middle of a desert landscape, BAUER Nimr LLC has been operating the world's largest commercial reed bed treatment plant for the treatment of oil-polluted water in Oman for more than ten years. It is significant not only because of its gigantic area of 13.5 km2, but also because of its particularly sustainable mode of operation.
Until 2025, the Aller Bridge in Verden will be rehabilitated piece by piece by SPESA Spezialbau und Sanierung GmbH in cooperation with SCHACHTBAU NORDHAUSEN GmbH and supplemented by replacement structures. About 7300 m³ of concrete and approx. 900 t of reinforcing steel will be installed.
Plants
The head office of the BAUER Group is located in the Bavarian town of Schrobenhausen.
Many events are held on the grounds of the headquarters, including the BAUER Maschinen Group's in-house exhibition, which attracts numerous national and international guests.
The factory premises in Schrobenhausen are located close to the head office.
Schachtbau Nordhausen has been part of the BAUER Group since 1992. The company is active nationally and internationally in mining, plant engineering, mechanical engineering and steel construction.
As a pioneer in the market, KLEMM has played a decisive role in the development of anchor drilling technology over the past five decades. This has resulted in a technological lead from which customers worldwide benefit.
You might also be interested in…
Our current press releases inform you about the news in the BAUER Group. Take a look now and don't miss anything!
At Bauer, it's the people who drive innovation. Teams pull together and achieve the impossible. Our motto: Passion for Progress.
Bauer's digitalization strategy combines a wide variety of areas through targeted networking.
We view sustainability as a question of responsibility for people and the environment. That’s why we are committed to sustainability in all divisions of our company.